Project Description
This project consisted of a ground up 21,000 square foot Compressed Natural Gas Truck Maintenance Facility with two story administration office and complete site development. The building included a wash bay with associated water treatment system, a six stall truck maintenance area with overhead bridge crane, radiant heating system, CNG detection system, a tire carousel, and plumbed maintenance fluid/air systems. The office area included ADA compliant locker rooms, a clean room for engine/transmission maintenance, and a two-stop elevator. Outside of the building the project included site concrete paving and a complete replacement of the site storm water treatment system.