Project Description
The Paradise Adventist Academy suffered severe fire and smoke damage during the 2018 Camp Fire. This project consisted of major structural repairs to the gymnasium, total HVAC system replacement throughout the campus, a campus-wide water filtration system, and complete interior and exterior finish replacement throughout the campus. The gymnasium received a new wood floor and installation of a commercial kitchen. All buildings received replacement roofs, including a 350-panel solar system.