Project Description

Complete redevelopment of existing 10,000 SF building for the development of new Oncology Center. Modern renovated every aspect of the building with exception of the structural members on the exterior walls. The final building delivery houses a Linear Accelerator, HDR Machine and CT Machine for state of the art Cancer treatment. The project included 9 exam rooms and two operating rooms, 8 offices, and a dosimetry lab.
Construction included removal of wood joist floor system and replacement with thickened slab on grade, all new interior walls and finishes, a new roofing system, ADA upgrades to the parking lot and site, and extensive coordination with specialized medical equipment vendors. Modern self-performed all demolition, concrete, accessories, wood stud framing and signage.