Project Description
Modern Building participated in a number of integral trades to construct this building through a multiple prime contracting method of construction delivery. The project included construction of an administrative services space for the Butte College Campus. This new 3-story building was constructed in the middle of an active campus, with tight construction constraints. Modern self-performed all site and building concrete, numerous finishes, and elevator systems. Building includes a concrete slab-on-grade and a 3-story structural steel frame. Exterior includes a combination of stucco and architectural metal cladding, with a single-ply roofing system.