Project Description

This project included the construction of two new production facilities for nut hulling and drying. Facility includes nut drying equipment, nut shelling collection pits, auger trenches for separating nuts from shells, and many other custom factory based features. Production area totals 45,000 SF. Project also includes the construction of new ranch management offices. The offices are a blend of refinished wood, valley stone and stucco, both on the interior and exterior. Encompassing 10,000 square feet, there are private, glass-walled-offices, conference rooms, open area staff work stations, high-vaulted beam ceilings, a completed kitchen/break room capable of hosting large dining events, a quality-control lab for the ranch. All of the exterior walls and underside of roof were sprayed with 6” of closed-cell foam insulation, to maximize energy efficiency and reduce exterior sound intrusion.